Starr Avenue – FM 1878

 

Location: Nacogdoches, TX

CSJ #: 1810-01-028

Contract Value: $1.4 Million

Completion Date: July 2016

Description:

Drewery Construction Co., Inc. was contracted to widen the portion of Starr Avenue (FM 1878) between North Street (BU 59-F) and Clark Boulevard from two to four lanes, with three-foot shoulders, as well as create six-foot sidewalks with ADA-curb ramps to accommodate pedestrians and improve overall transportation conditions around the Stephen F. Austin State University campus.

Work included the removal of approximately 8 inches of concrete and asphalt pavement, totaling over 7,500 SY, and replacing it with treated cement subgrade, 10-inch asphalt pavement and the appropriate storm drainage systems. New traffic signals were also installed at the avenue’s intersections with North and Mound streets.

Project Length (ft)

Concrete/Asphalt Removed (SY)

Project Timeframe (Days)